The Publications Office of the EU is in the process of updating some of the content on this website in the light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Works - 433106-2018

05/10/2018    S192    Works - Prior information notice without call for competition - Not applicable 

Romania-Timisoara: Construction work for water projects

2018/S 192-433106

Prior information notice

This notice is for prior information only

Works

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Banat River Basin Administration
National registration number: 18263352
Town: Timisoara
NUTS code: RO42
Postal code: 300222
Country: Romania
Contact person: Mihaela Jurculet; Octavia Georgescu
E-mail: octavia.georgescu@dab.rowater.ro
Telephone: +40 256491843
Fax: +40 256491798

Internet address(es):

Main address: www.rowater.ro/ababanat

Address of the buyer profile: www.rowater.ro/ababanat

I.2)Information about joint procurement
The contract is awarded by a central purchasing body
I.3)Communication
Additional information can be obtained from the abovementioned address
Electronic communication requires the use of tools and devices that are not generally available. Unrestricted and full direct access to these tools and devices is possible, free of charge, at: www.rowater.ro/ababanat
I.4)Type of the contracting authority
Ministry or any other national or federal authority, including their regional or local subdivisions
I.5)Main activity
Other activity: Water management

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

The repairing of the Navigation Infrastructure on Bega Canal; Tender Procedure for Technical Documentation, Works Execution and Projectants Assistance Related to HC Sinmihaiu Roman

Reference number: RORS 15
II.1.2)Main CPV code
45240000
II.1.3)Type of contract
Works
II.1.4)Short description:

The position of the works that are the subject of this investment are placed in the hydrographical area Bega-Timis-Caras on Bega water channel, area of the Sanmihaiul Roman village, at the approximately 950 m upstream from Sinmihai Bridge over the canal, in front of the Km 28+200 on the dike left bank measured from Serbian border. The investment does not foresee new constructions, most of the proposed work being for reappearing, consolidation and replacement of some constructive elements that are damaged or being in an advanced degradation status.

II.1.5)Estimated total value
Value excluding VAT: 4 792 174.78 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.1)Title:
II.2.2)Additional CPV code(s)
45247212
45248000
45248100
71242000
71420000
II.2.3)Place of performance
NUTS code: RO42
NUTS code: RO424
Main site or place of performance:

Sinmihai Roman Village, Timis County

II.2.4)Description of the procurement:

The designed works are foreseen to be executed in 5 stages, including the land restorations after works finishing.

— Phase 1: Deviation of waters through the lock and putting the weir dam to dry*,

— Phase 2: Rehabilitation of weir dam**,

— Phase 3: Placing the lock to dry,

— Phase 4: Rehabilitation lock,

— Phase 5: Island restoration***,

*The proposed works to be realized in the first stage were realized and receptioned.

These consisted of realizing a discharge sill in order to assure the transit in good conditions for the entire operating flows through the lock canal during the entire period of dam rehabilitation works. In the meantime a part of the necessary accesses were realized, the temporary bridge over the lock to permit the access to the island and the access road on the island to realize the works of placing the lock to dry. These are going to be subsequently decommissioned during this program.

** Exploitation constructions is projected in this program and will be executed in other financing program.

*** Restoration of the island landscape will be designed in this program and will be executed in other financing program

II.2.14)Additional information

Value excluding VAT: 4 792 174,78 EUR.

II.3)Estimated date of publication of contract notice:
07/11/2018

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes

Section VI: Complementary information

VI.3)Additional information:

1) Source of founding: INTERREG - IPA Cross Border Cooperation Romania — Serbia Programme, Priority axes 3: Sustainable mobility and accessibility, Measure 3.1: transport and infrastructure mobility and services, project: "The repairing of the navigation infrastructure on Bega Canal", Project eMS code: RORS 15;

2) The procurement procedure is in line with PRAG, version 2015.0 (The practical guide explains contracting procedures for EU external aid contracts financed by the EU general budget (Budget) and the 10th European Development Fund (EDF).)

VI.5)Date of dispatch of this notice:
02/10/2018