Kurze Beschreibung
The Tendering Company plans the installation of the Offshore Wind Farm "EnBW He Dreiht" with 900 MW grid capacity, approximately 90 km of the North Sea coast.
The Tenderer shall bid for the foundation transport and installation (TI) scope.
The scope includes the following main points:
- TI scour protection incl. supply of rock material
- Handling, storage and logistics at the base port
- TI monopile (MP)
- TI anode cage (AC) and transition piece (TP) incl. grouted connection
- Rest works, secondary works & potential repair works.
Start of offshore works is Q1 2024.