Description of the procurement
Under the Framework Contract the Contractor will be required to support F4E in following activities:
— Data analysis,
— Assessment of metrology-related documents and files produced by F4E’s suppliers,
— Procedure simulation and design,
— Virtual assembly,
— Uncertainty field assessment,
— Reverse engineering,
— Field survey, installation of networks of metrology reference points,
— Reporting about tasks mentioned above,
— Development of bespoke software,
— Design and manufacturing of bespoke metrology accessories.