494202-2026 - Competition
Poland – Construction work – Circulating Water System Intake Equipment Package
OJ S 136/2026 17/07/2026
Contract or concession notice – standard regime
Works
1. Buyer
1.1.
Buyer
Official nameBECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Emailjlwest@bechtel.com
2. Procedure
2.1.
Procedure
TitleCirculating Water System Intake Equipment Package
DescriptionThe scope of work for this package consists of, but is not limited to, designing, furnishing material, fabricating, testing, and delivering complete and fully operational equipment, detailed as: a. Twenty-four (24) automatic dual flow type traveling water screens b. Thirty-three (33) trash racks c. Six (6) motorized trash rack raking systems with associated monorail and support d. structures. Two (2) raking systems per unit where each rake covers six (6) or five (5) trash racks e. Two (2) intake tunnel stop gates (1 per tunnel). Nine (9) circulating water pump suction stop gates. The traveling screens shall be designed for continuous, submerged service in brackish Baltic seawater to support a cooling water intake structure with a depth of 23m. Design conditions for Baltic Sea chloride concentration will be considered and specified further in the RFQ Package. There shall be material selection consideration to exposure conditions such as stagnation, biofouling, mussel formation, and frazil ice formation. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual quantities and dimension numbers will be included in official bid package. Deadline (Pre-qualification Submittal): August 2026 (Forecast – Subject to change); RFQ Document Issuance: November 2026 (Forecast – Subject to change); Supplier Proposals Due: January 2027 (Forecast – Subject to change); Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required On Site Date: Unit 1: July 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package. Additional delivery schedule information will be provided in the RFQ Package
Procedure identifierb475ea0b-b805-4261-8a56-30e95d51fe4c
2.1.1.
Purpose
Main nature of the contractWorks
Main classification (cpv): 45000000 Construction work
2.1.2.
Place of performance
TownLubiatowo-Kopalino
Postcode84-210
Country subdivision (NUTS)Gdański (PL634)
CountryPoland
Additional information1. Experienced and qualified Companies are invited to provide a proposal for designing and delivering the Circulating Water System Intake Equipment (Bechtel Goods & Services Code MLST) for the Poland Nuclear Power Plants. The scope of work shall include designing, fabricating, and delivery of Circulating Water System Intake Equipment that meets specifications, drawings, and other purchase order requirements. Delivery may be performed by either Bechtel or company, as determined by Bechtel. Interested companies must register/update their Company's information in Bechtel's iSupplier portal at https:// www.bechtel.com/supplier/. If Company has any questions or to express interest in bidding this requirement, Company shall notify Bechtel’s Contact Person. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire where interested party would complete with response to Bechtel for review. Bechtel notes that previous proven capabilities and experience of similar scale and complexity will be mandatory and additional documentation / evidence may be required. 2. The prequalification criteria shall be included in the prequalification questionnaire, examples thereof include demonstration of (i) experience in furnishing similar cooling water intake equipment in past or current projects, (ii) availability of equipment/personnel/facilities for performance of scope (e.g. welding and testing), (iii) quality compliance to ISO 9001:2015 or quality program that is comparable to ISO 9001 (to be approved by Bechtel and PEJ), (iv) compliance to certification of legally mandatory requirements, (v) financial standing (solvency), and (vi) organizational capabilities. Shop visits prior to perform a supplier survey or audit prior to RFQ issuance may be required. 3. Upon Bechtel’s evaluation of your response to the Poland Prequalification Questionnaire, Bechtel will notify if your Company meets, conditionally meets, or does not meet the prequalification requirements that closely match the requirements. Your Company's submission of Prequalification Questionnaire does not automatically qualify your Company to be a pre-qualified Company for the Scope. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: a. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or b. economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. 4. Each prequalified Company will be required to execute a Non-Disclosure Agreement (NDA). 5. Companies meeting the prequalification criteria and who have executed the NDA will be invited to submit the proposals for Circulating Water System Intake Equipment Package. 6. The Request for Quotation (RFQ) shall include the proposal questionnaire, scope of work, specifications, drawings, datasheets/vendor provided data, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. Supplier User Guides: https://www.bechtel.com/supplier/#registration-Info 7. Proposal may be provided in EURO, PLN, USD. Furthermore, the proposals will be requested as Unit Pricing. 8. Award will be made to the responsive and responsible company whose proposal meets the requirements of the RFQ and provides a technically acceptable proposal. Consideration of the following key criteria, together with cost, will determine the final decision for award(s), which will be detailed further in the Bid Document(s) and during the RFQ phase. a. Technical Capability b. Previous Proven Relevant Experience c. Quality d. Delivery Management Team e. Schedule The evaluation factors to determine the selected proposal shall be based on the commercial factors that impact overall cost, such as freight, proximity to project site, Carbon Border Adjustment Mechanism (CBAM) requirements, payment terms, performance and payment securities, and insurance. Buyer may divide the award among more than one Supplier if this is in the best interest of Buyer. Supplier must specifically list in their proposal all the country(ies) of origin for each major component. All materials must meet the requirements of the applicable codes and specifications of the RFQ. 9. Any Companies that do not meet the legally mandatory compliance requirement will be excluded. 10. The procedure for the Company to gain access to classified information, as required, will be subject to compliance with the executed NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFQ document. 11.The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
2.1.4.
General information
Additional informationThe Company shall certify that (i) is not subject to Sanctions, and (iii) do not present a threat to the security interests of the Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this Section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. The Company shall confirm that all subcontractors of any tier will provide that they are not subject to any of criterion mentioned above as a part of the Proposal. The Company shall also confirm that no Iron and Steel products subject to EU import ban, including those processed from third party, are used in furnishing the requested product. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the Company or undertaking relating to or in connection with this submittal of Prequalification Questionnaire or undertaking's, such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Any Companies that do not meet the legally mandatory compliance requirements, as specified above, will be excluded. Deadline (Pre-qualification Submittal): August 2026 (Forecast – Subject to change); RFQ Document Issuance: November 2026 (Forecast – Subject to change); Supplier Proposals Due: January 2027 (Forecast – Subject to change); Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required On Site Date: Unit 1: July 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package. Additional delivery schedule information will be provided in the RFQ Package
Legal basis
Other
Other
2.1.6.
Grounds for exclusion
Sources of grounds for exclusionProcurement Document
5. Lot
5.1.
LotLOT-0001
TitleCirculating Water System Intake Equipment Package
DescriptionThe scope of work for this package consists of, but is not limited to, designing, furnishing material, fabricating, testing, and delivering complete and fully operational equipment, detailed as: a. Twenty-four (24) automatic dual flow type traveling water screens b. Thirty-three (33) trash racks c. Six (6) motorized trash rack raking systems with associated monorail and support d. structures. Two (2) raking systems per unit where each rake covers six (6) or five (5) trash racks e. Two (2) intake tunnel stop gates (1 per tunnel). Nine (9) circulating water pump suction stop gates. The traveling screens shall be designed for continuous, submerged service in brackish Baltic seawater to support a cooling water intake structure with a depth of 23m. Design conditions for Baltic Sea chloride concentration will be considered and specified further in the RFQ Package. There shall be material selection consideration to exposure conditions such as stagnation, biofouling, mussel formation, and frazil ice formation. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual quantities and dimension numbers will be included in official bid package.
5.1.1.
Purpose
Main nature of the contractWorks
Main classification (cpv): 45000000 Construction work
5.1.2.
Place of performance
TownLubiatowo-Kopalino
Country subdivision (NUTS)Gdański (PL634)
CountryPoland
5.1.9.
Selection criteria
Sources of selection criteriaProcurement Document
5.1.12.
Terms of procurement
Terms of submission
Electronic submissionAllowed
Address for submissionhttps://www.bechtel.com/supplier/#registration-Info
Languages in which tenders or requests to participate may be submittedEnglish
5.1.16.
Further information, mediation and review
Review organisationBECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
8. Organisations
8.1.
ORG-0001
Official nameBECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
TownGdansk
Postcode84-210
Country subdivision (NUTS)Gdański (PL634)
CountryPoland
Contact pointJulie Mertz
Emailjlwest@bechtel.com
Telephone+1-571-392-6415
Internet addresshttps://www.bechtel.com/projects/poland-ap1000-nuclear-power-plant/
Information exchange endpoint (URL)https://www.bechtel.com/projects/poland-ap1000-nuclear-power-plant/
Roles of this organisation
Buyer
Review organisation
8.1.
ORG-0000
Official namePublications Office of the European Union
Registration numberPUBL
TownLuxembourg
Postcode2417
Country subdivision (NUTS)Luxembourg (LU000)
CountryLuxembourg
Emailted@publications.europa.eu
Telephone+352 29291
Internet addresshttps://op.europa.eu
Roles of this organisation
TED eSender
Notice information
Notice identifier/version0371250d-c3d9-4a47-aa3f-2d1de3018ddd  -  01
Form typeCompetition
Notice typeContract or concession notice – standard regime
Notice subtypeE3
Notice dispatch date15/07/2026 21:02:14 (UTC+00:00) Western European Time, GMT
Languages in which this notice is officially availableEnglish
Notice publication number494202-2026
OJ S issue number136/2026
Publication date17/07/2026