Description of the procurement
Under the framework contract the contractor will be required to support F4E in following activities:
— Data analysis.
— Assessment of metrology-related documents and files produced by F4E’s suppliers.
— Procedure simulation and design.
— Virtual assembly.
— Uncertainty field assessment.
— Reverse engineering.
— Field survey, installation of networks of metrology reference points.
— Reporting about tasks mentioned above.
— Development of bespoke software.
— Design and manufacturing of bespoke metrology accessories.