Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
ABS/NBS Hamburg/ Bremen - Hannover; Abschnitt 3 „Hannover - Celle (Strecke 1710)“ - Planungsleistung
Reference number: 18FEI32239
II.1.2)Main CPV code71240000 Architectural, engineering and planning services
II.1.3)Type of contractServices
II.2)Description
II.2.1)Title:
ABS/NBS Hamburg/ Bremen - Hannover; Abschnitt 3 „Hannover - Celle (Strecke 1710)“ - Planungsleistung
Lot No: 1
II.2.2)Additional CPV code(s)71240000 Architectural, engineering and planning services
II.2.3)Place of performanceNUTS code: DE929 Region Hannover
II.2.4)Description of the procurement at the time of conclusion of the contract:
ABS/NBS Hamburg/ Bremen - Hannover; Abschnitt 3 „Hannover - Celle (Strecke 1710)“ – Planungsleistung: KIB, Verkehrsanlagen, Schall & Erschütterung, Techn. Streckenausrüstung, Erstellung BAst, Baugrund & Gründungsberatung.
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 15/09/2018
End: 30/09/2020
II.2.13)Information about European Union fundsThe procurement is related to a project and/or programme financed by European Union funds: no
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
ABS/NBS Hamburg/ Bremen - Hannover; Abschnitt 3 „Hannover - Celle (Strecke 1710)“ - Planungsleistung
V.2)Award of contract/concession
V.2.1)Date of conclusion of the contract/concession award decision:30/08/2018
V.2.2)Information about tendersThe contract/concession has been awarded to a group of economic operators: no
V.2.3)Name and address of the contractor/concessionaireOfficial name: BPR Schäpertöns Consult GmbH & Co KG
Town: Berlin
NUTS code: DE30 Berlin
Country: Germany
The contractor/concessionaire is an SME: no
V.2.4)Information on value of the contract/lot/concession (at the time of conclusion of the contract;excluding VAT)Total value of the procurement: 1.00 EUR
Section VI: Complementary information
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review bodyOfficial name: Vergabekammer des Bundes
Postal address: Villemomblerstr. 76
Town: Bonn
Postal code: 53123
Country: Germany
VI.4.3)Review procedurePrecise information on deadline(s) for review procedures:
Die Geltendmachung der Unwirksamkeit einer Auftragsvergabe in einem Nachprüfungsverfahren ist fristgebunden. Es wird auf die in § 135 Abs. 2 GWB genannten Fristen verwiesen. Nach § 135 Abs. 2 S. 2 GWB endet die Frist zur Geltendmachung der Unwirksamkeit 30 Kalendertage nach Veröffentlichung der Bekanntmachung der Auftragsvergabe im Amtsblatt der Europäischen Union. Nach Ablauf der jeweiligen Frist kann eine Unwirksamkeit nicht mehr festgestellt werden.
VI.5)Date of dispatch of this notice:24/04/2020
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code71240000 Architectural, engineering and planning services
VII.1.2)Additional CPV code(s)71240000 Architectural, engineering and planning services
VII.1.3)Place of performanceNUTS code: DE929 Region Hannover
VII.1.4)Description of the procurement:
ABS/NBS Hamburg/ Bremen - Hannover; Abschnitt 3 „Hannover - Celle (Strecke 1710)“ – Planungsleistung: KIB, Verkehrsanlagen, Schall & Erschütterung, Techn. Streckenausrüstung, Erstellung BAst, Baugrund & Gründungsberatung
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 15/09/2018
End: 30/09/2020
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)Total value of the contract/lot/concession: 563 166.63 EUR
VII.1.7)Name and address of the contractor/concessionaireOfficial name: BPR Schäpertöns Consult GmbH & Co KG
Town: Berlin
NUTS code: DE30 Berlin
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.1)Description of the modificationsNature and extent of the modifications (with indication of possible earlier changes to the contract):
N25: Variantenuntersuchung Ausrüstung Streckenübergänge 1710/1711 mit ETCS
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Während des Planungsprozesses hat sich gezeigt, dass für die Ausrüstung der Strecke 1710 mit ETCS zusätzliche ETCS Ein- und Ausstiege auf die parallel verlaufende Strecke 1711 geplant werden müssen. Hierzu ist zunächst eine Variantenuntersuchung durchzuführen und mit einer groben Kostenschätzung zu unterlegen. Da der AN bereits die Leit- und Sicherungstechnik (ETCS) für die Strecke 1710 plant und aufgrund von sich überschneidenden Stellbereichen der Stellwerke eine starke technische Abhängigkeit zwischen der Sicherungstechnik der Strecken 1711 und 1710 besteht, ist eine durchgängige planerische Betrachtung notwendig. Der Wechsel des AN würde zur erheblichen Verzögerung der bereits ambitionierten Terminschiene sowie zu den daraus resultierenden Zusatzkosten führen.
VII.2.3)Increase in priceUpdated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 896 085.83 EUR
Total contract value after the modifications
Value excluding VAT: 931 085.83 EUR