This notice is for prior information only
Legal Basis:
The contract will be financed by European Investment Bank (EIB) and is subject to EIB's Guide to Procurement.
Section I: Contracting authority
I.1)Name and addressesOfficial name: Joint Stock Company for Public Railway Infrastructure Management: ‘Serbian Railways Infrastructure’ JSC
Postal address: 6, Nemanjina street
Town: Belgrade
NUTS code:
RS Srbija/Сpбија / SerbiaPostal code: 11000
Country: Serbia
Contact person: 6, Nemanjina street
E-mail:
sasa.zlatkovic@srbrail.rsTelephone: +381 113621192
Internet address(es): Main address:
https://infrazs.rs/ I.3)CommunicationAccess to the procurement documents is restricted. Further information can be obtained at:
https://infrazs.rs/Additional information can be obtained from the abovementioned address
I.4)Type of the contracting authorityBody governed by public law
I.5)Main activityOther activity: Railway services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Reconstruction and Modernization of Railway Line ‘Niš-Dimitrovgrad – Section Prosek (Sićevo)-Dimitrovgrad
Reference number: EIB-GtP/ 1/2021/3.3
II.1.2)Main CPV code45234100 Railway construction works
II.1.3)Type of contractWorks
II.1.4)Short description:
Reconstruction and modernization of all railway sub-systems of the railway line Section – Prosek (Sićevo)-Dimitrovgrad (app 82 km) on TEN-T Core Network implemented in accordance with FIDIC Contract Conditions for ‘Plant and Design-Build’ (‘Yellow Book’).
II.1.5)Estimated total value
II.1.6)Information about lotsThis contract is divided into lots: no
II.2)Description
II.2.3)Place of performanceNUTS code: RS Srbija/Сpбија / Serbia
Main site or place of performance:
The Republic of Serbia, in its ‘Southern and Eastern Region’ from the surrounding of the City of Niš until the border between the Republics of Serbia and Bulgaria on on the existing railway line.
II.2.4)Description of the procurement:
Scope of the procurement includes design-build activities for reconstruction and modernization of the existing railway line in a length of approximately 82 km and will be consisted (but not limited to) of the following main activities:
— preparation of design documentation in accordance with the Serbian regulations,
— reconstruction of the permanent way of the single non-electrified track and belonging facilities from Prosek (Sićevo) to Dimitrovgrad of approx. 82 km,
— construction of the electrification sub-system (including ground works, concrete works, Installation of pillars and portals, performance of grounding and electro technical installations) including two traction sub-stations, sectioning facility and neutral section at the state border,
— connection of the Electro traction substations (ETS-EVP) 110/25 kV to the national network of 110 kV.
II.2.14)Additional information
II.3)Estimated date of publication of contract notice:27/06/2021
Section IV: Procedure
IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)The procurement is covered by the Government Procurement Agreement: no
Section VI: Complementary information
VI.3)Additional information:
National authorisation (licencing) for construction works and designing is a legal requirement and has to be complied with at the time of the contract signature (not a condition for participating and getting the contract awarded).
Legal basis:
• Regulation (EU) No 236/2014 of the European Parliament and of the Council of 11 March 2014 laying down common rules and procedures for the implementation of the Union's instruments for financing external action.
• Law of the Republic of Serbia on approval of the Finance Contract Niš-Dimitrovgrad Railway between the Republic of Serbia and the European Investment Bank FI No 86763 (RS), Serapis No 2016-0341.
• Decision No.466 / 2014 / EU, published in the Official Journal of the EU, No L 135 of 8 May 2014.
VI.5)Date of dispatch of this notice:20/05/2021