Dienstleistungen - 280659-2018

Unrevised Machine Translation

29/06/2018    S123

Germany-Bayreuth: Electricity distribution

2018/S 123-280659

Contract notice – utilities

Services

Legal Basis:

Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
TenneT TSO GmbH
Bernecker Straße 70
Bayreuth
95448
Germany
Contact person: TenneT TSO GmbH
E-mail: bnbm@tennet.eu
NUTS code: DE242

Internet address(es):

Main address: http://www.tennet.eu/de/home.html

I.1)Name and addresses
Transnet BW GmbH
Pariser Platz, Osloer Straße 15-17
Stuttgart
70173
Germany
Contact person: Transnet BW GmbH
E-mail: bnbm@tennet.eu
NUTS code: DE111

Internet address(es):

Main address: https://www.transnetbw.de/de

I.1)Name and addresses
Amprion GmbH
Rheinlanddamm 24
Dortmund
44139
Germany
Contact person: Amprion GmbH
E-mail: bnbm@tennet.eu
NUTS code: DEA52

Internet address(es):

Main address: https://www.amprion.net/

I.2)Information about joint procurement
The contract involves joint procurement
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://platform.negometrix.com/PublishedTenders.aspx?tenderid=90695
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://platform.negometrix.com/PublishedTenders.aspx?tenderid=90695
I.6)Main activity
Electricity

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Special network equipment (bnBm)

II.1.2)Main CPV code
65310000
II.1.3)Type of contract
Services
II.1.4)Short description:

TenneT TSO, TransnetBW and Amprion intend to supply third parties with benefits pursuant to § 11 para. 3 Energy Industry Act (EnWG) (provision and operation of special operational equipment — bnBm) to restore the safety and reliability of the electricity supply system in the event of a local failure of one or more inputs on the transmission system.

The active power output of 1 200 MW is divided into 12 lots, each with 100 MW, divided into 4 batches. For details on the detachment of the lot under point: Date to be specified in the Notice.

BnBm has to lead to an increase in useful curative re-dispatching potential. Furthermore, a bnBm must either be governed by German law or the tenderer must demonstrate, by any appropriate means, that there is at no time legal or administrative restrictions in the way of providing a service.

Note: The above two conditions are subject to the exclusion criteria.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: yes
Tenders may be submitted for all lots
Maximum number of lots that may be awarded to one tenderer: 12
The contracting authority reserves the right to award contracts combining the following lots or groups of lots:

The procedure is described in the terms of the tender.

II.2)Description
II.2.1)Title:

BnBm — Lot A

Lot No: 1
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

— The distribution of the total quantity of 1 200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

— In each lot group there are 3 lots of 100 MW each.

— A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

— The contract is awarded to the most economically advantageous batch of lots by lot.

— Candidates must already state in their request for participation how many lots they apply to in which lot.

The bnAB must meet at least the following technical requirements:

— Time between the signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s network, to a maximum of 30 minutes

— Possibility to obtain uninterrupted delivery/reduction of supply — at least 38 hours

— total operating time per calendar year of at least 500 hours

— time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

Capacity of the electricity transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot A

Lot No: 2
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot A

Lot No: 3
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot B

Lot No: 4
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot B

Lot No: 5
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot B

Lot No: 6
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot C

Lot No: 7
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot C

Lot No: 8
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot C

Lot No: 9
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot D

Lot No: 10
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot D

Lot No: 11
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information
II.2)Description
II.2.1)Title:

BnBm — Lot D

Lot No: 12
II.2.2)Additional CPV code(s)
65300000
31200000
II.2.3)Place of performance
NUTS code: DE
II.2.4)Description of the procurement:

The subject matter of the procurement is the provision and operation of special network technical equipment (“bnBm”) in accordance with § 11 para. 3 EnWG, in particular their use on request of the transmission system operator, to whose transmission system the bnBm is connected.

In the award procedure, the tender received will determine the overall economic combination of the lots within a lot group, taking into account the following conditions:

• The distribution of the total quantity of 1.200 MW to be procured will be divided equally between four lot groups, representing 300 MW per batch.

• In each lot group there are 3 lots of 100 MW each.

• A group of lots may be offered for a single batch of 100 MW or for batch packages (i.e. 200 MW or 300 MW).

• The contract is awarded to the most economical combination of lots per lot.

• Candidates must already state in their call for applications for how many lots they apply to what lot in which lot they apply.

The bnAB must meet at least the following technical requirements:

• Time between signal of the respective transmission system operator to full load delivery on the respective transmission system operator’s net — maximum 30 minutes

• Possibility to provide uninterrupted supply/reduction of the service — at least 38 hours

• total operating time per calendar year of at least 500 hours

• time interval between two consecutive uninterrupted supplies/reductions to output — maximum 12 hours

• Level of the power maintained for the respective transmission system operator — 100 MW, 200 MW or 300 MW

Provided that, in order to allow the bnBm offered here, the creation or extension of a substation/transformation equipment is necessary and for which no suitable land is available to the contracting authority, the transfer of a plot of land suitable for this purpose is also part of the subject of the contract. Contracting entities will provide the requirement for transfer of land with the outcome of the site audit procedure.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Start: 01/10/2022
End: 30/09/2032
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
II.2.10)Information about variants
Variants will be accepted: yes
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
List and brief description of conditions:

Evidence shall be furnished by the production of the following documents or of equivalent documents:

— current extract from the professional or trade register, dated no later than 3 months following the date of expiry of the request to participate;

Description of the business organisation (including the business model)

— self-declaration that there are no grounds for exclusion under § § 123 and § 124 GWB.

The forms to be used for this demonstration are to be made available through the communication platform mentioned under point I.3 above.

III.1.2)Economic and financial standing
List and brief description of selection criteria:

Declaration of overall turnover and turnover in the sector covered by the contract to be awarded for the last three financial years preceding the closing date for submission of applications;

Submission of an updated economic advice, not older than 6 months at the end of the participation deadline;

— evidence of a corresponding holding liability insurance for liability risks (not more than 6 months old on expiry of the submission deadline).

The forms to be used for this demonstration are to be made available through the communication platform mentioned under point I.3 above.

Minimum level(s) of standards possibly required:

— For the last three financial years, the applicant must provide evidence of an average annual turnover not less than EUR 40 million or a firm commitment to the same amount by either equity or debt. Should a candidate bid for more than one lot, the assessment of the minimum turnover shall be determined on the basis of the number of these lots;

— proof of equivalent liability insurance covering liability risks of EUR 1 000 000 (one million euros) per MW of deliverable contracted per claim must be submitted. In so far as they are not already available, an obligation to conclude such insurance immediately upon receipt of a supplement and to submit a certificate to that effect without being required to do so; In all cases, the applicant must undertake to maintain insurance for the duration of the contract.

III.1.3)Technical and professional ability
List and brief description of selection criteria:

— Suitable references for orders executed earlier that take the form of a list of the principal services provided and carried out in the past 10 years before the submission deadline, including identification of the principal, main permit (s), main content, contract and final value of the contract, length of service, duration of service. Where the services intended to be provided by the applicant are supplied by means of a plant for the production of electrical energy,

In addition, the comparable references should include information on the construction phase. In order to fulfil the comparability requirement, references must be consistent with the technology offered at a later date, in particular with regard to technical criteria in the terms of the tender.

Information on the subcontracting envisaged must be provided if such a statement can already be made.

The forms to be used for the purpose of detection are the forms provided via the communication platform mentioned under point I.3 above.

Minimum level(s) of standards possibly required:

— Evidence of experience in the field of services to be awarded shall be requested by indicating at least one reference contract which has been delivered in the past 10 years before the deadline for participation (i.e. the period 2008-2018) as applied to the reference period. The reference contract must be similar in nature and complexity to the performance to be awarded.

III.1.4)Objective rules and criteria for participation
III.1.5)Information about reserved contracts
III.1.6)Deposits and guarantees required:

see the provisions of the contract

III.1.7)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:

see the provisions of the contract

III.1.8)Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
III.2)Conditions related to the contract
III.2.1)Information about a particular profession
III.2.2)Contract performance conditions:
III.2.3)Information about staff responsible for the performance of the contract

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Negotiated procedure with prior call for competition
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.4)Information about reduction of the number of solutions or tenders during negotiation or dialogue
Recourse to staged procedure to gradually reduce the number of solutions to be discussed or tenders to be negotiated
IV.1.6)Information about electronic auction
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)Administrative information
IV.2.1)Previous publication concerning this procedure
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 01/08/2018
Local time: 16:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
German
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
IV.2.7)Conditions for opening of tenders

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.2)Information about electronic workflows
VI.3)Additional information:

EUR 1. The award of the contract is subject to the modification of the legal and/or regulatory framework, regulations and regulations in force at the time of publication of the contract notice.

EUR 2. Applicants are invited to indicate in a binding manner which (existing) connection point you intend to implement the bnBm. On the basis of this information, the contracting authorities will carry out and afterwards report on whether and at what capacity (100 MW/200 MW/300 MW) the desired connection is feasible.

EUR 3. The specific contract for the provision and operation of a specific network equipment pursuant to § 11 para. 3 EnWG (hereinafter referred to as ‘EnWG’) will be concluded between the successful tenderer and

The respective transmission system operator, in whose network the special network equipment pursuant to § 11 subpara. 3 EnWG. Contracting entities shall make clear that the joint and several liability of the contracting authorities/entities is excluded.

EUR 4. In addition to the qualifications required under II.1, applicants must prove the absence of grounds for exclusion (see Sections 123 and 124 of the GWB), either in every candidate group or in a third party, on whose eligibility a candidate or a member of a candidate group invokes. The forms to be used for the purpose of detection are the forms provided via the communication platform mentioned under point I.3 above.

EUR 5. Reliance on the performance and professional qualifications of third parties: An enterprise may prove its ability and professional knowledge of third party skills, including as members of a group. Subcontractors), irrespective of the legal nature of the links existing between them and these third parties (loan).

EUR 6. For the applicant: Applications may be submitted as candidate Community. A group of applicants is treated as an applicant.

EUR 7. The contracting authorities reserve the right to award the contract to the initial offers without negotiation (see Section 15. 4 SektVO).

EUR 8. The contracting entity Amprion GmbH, which is not contracting entity pursuant to § 100 para. 1 No 2 GWB, the procedure is conducted in accordance with the legal requirements pursuant to § 11 para. 3 EnWG and the rules of procedure laid down in the tender documents. In addition, there is no entitlement to the application of part 4 of the GWB and of the SektVO in relation to the contracting entity Amprion GmbH. This also applies if the tender documents refer to provisions laid down in part 4 of the GWB or the SektVO. Position of the tenderers in respect of the submission of comments in due time in accordance with point (d) of the first subparagraph, VI.4.3 is applicable (see also no. 14.1 of the information memorandum and 9.2 of the terms of the tender).

EUR 9. Point No I.3) This notice: Requests to participate shall be submitted exclusively in electronic form, via the link referred to therein. However, it may be necessary to submit tenders in written form in written form. See section III_bnBm_Tender conditions.

Other requirements are made up of I_bnBm_information memorandum.

VI.4)Procedures for review
VI.4.1)Review body
Regierung Mittelfranken – Vergabekammer Nordbayern
Postfach 606
Ansbach
91511
Germany
Telephone: +49 981531277
E-mail: vergabekammer.nordbayern@reg-mfr.bayern.de
Fax: +49 981531837

Internet address: http://www.regierung.mittelfranken.bayern.de

VI.4.2)Body responsible for mediation procedures
VI.4.3)Review procedure
Precise information on deadline(s) for review procedures:

On the scope of the provisions of § 160 subpara. 3 Sentence 1 No 4 of the Act

Restrictions on competition (GWB) are explicitly mentioned. According to which, a request for initiation of an inspection procedure is inadmissible;

To the extent that more than 15 calendar days have elapsed from the receipt of notification by the contracting authority of a complaint.

Amprion GmbH is not subject to the scope of application of part 4 of the GWB and therefore not to the law on disclosure. Dortmund court in this case is Dortmund Regional Court in this case.

Kaiserstraße 34

44135 Dortmund

Fax: 0231 926 10200

VI.4.4)Service from which information about the review procedure may be obtained
Regierung Mittelfranken – Vergabekammer Nordbayern
Postfach 606
Ansbach
91511
Germany
Telephone: +49 981531277
E-mail: vergabekammer.nordbayern@reg-mfr.bayern.de
Fax: +49 981531837

Internet address: http://www.regierung.mittelfranken.bayern.de

VI.5)Date of dispatch of this notice:
26/06/2018