Official name: Morgan Sindall Construction and Infrastructure Ltd
National registration number: 04273754
Postal address: Banna Court, Westlakes Science Park, Moor Row, Cumbria
Town: Moor Row
NUTS code: UK UNITED KINGDOM
Postal code: CA24 3HW
Country: United Kingdom
Contact person: Vikki Brett
E-mail: vikki.jt.brett@sellafieldsites.com

Internet address(es):

Main address: https://www.gov.uk/government/case-studies/shared-services-alliance-ssa-for-nuclear-decommissioning-estate

I.2)Information about joint procurement
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=12720&B=SELLAFIELD
Additional information can be obtained from the abovementioned address
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: Nuclear Decommissioning

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Cable Diversion Services

Reference number: PPP/RAP/
II.1.2)Main CPV code
45315300 Electricity supply installations
II.1.3)Type of contract
Works
II.1.4)Short description:

Expression of interest — please contact Vikki Brett at vikki.jt.brett@sellafieldsites.com to confirm your interest.

The scope of the services required for the cable diversion comprises of:

• detail design,

• procurement,

• construction/build,

• pre-commissioning,

• support to commissioning (by others).

The cables comprise of low voltage (400 v), high voltage (11 kV) communication cables (telecontrol) to include civil infrastructure.

Located on a nuclear licensed site, external to the current onsite national nuclear laboratory within the Sellafield site. Currently identified as eight cable diversion packages of work (D&B) and 1 Civil work package (build to print) relating to the diversion and/or replacement of a number of cables owned by the Utilities department and provision of a new cable pit.

There is also a requirement to include the provision of new power supplies of 400 V.

It is to be noted that it is estimated that 80 % of the work is associated with low voltage work.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.1)Title:
II.2.2)Additional CPV code(s)
45315400 High voltage installation work
45315600 Low-voltage installation work
II.2.3)Place of performance
NUTS code: UK UNITED KINGDOM
Main site or place of performance:

UKD11.

II.2.4)Description of the procurement:

Provision of design and build services association with high 11 kV, low voltage 400 V and associated control/telecontrol cable diversion.

Provision of civil infrastructure design and build to accommodate diversions, cable ducts, pits etc.

II.2.14)Additional information

Relevant certification for all electrical work.

II.3)Estimated date of publication of contract notice:
13/07/2020

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no

Section VI: Complementary information

VI.3)Additional information:
VI.5)Date of dispatch of this notice:
26/06/2020