I. The documentation of this procedure is available on the platform in the “Annexes” tab. The document is downloaded by clicking on the selected annex and pressing the “Download” command. In order to collect all the attachments at the same time, choose the order “download the package” and then “retrieve all the organiser attachments”.
II. The contracting authority states that, acting on the basis of Article 24aa of the Public Procurement Act, it will first assess the tenders and then examine whether the economic operator whose tender has been declared the most advantageous is not excluded and meets the conditions for participation in the procedure.
III. The bid must be secured by a security of PLN: PLN 25 976,00.
IV. Documents proving that the supplies offered meet the requirements specified by the contracting authority (according to § 13 para. 1 (4) of the Regulation on documents):
1. Detailed technical documentation of the manufacturer of the equipment offered as required. The technical documentation will be the basis to confirm that the technical characteristics of the equipment and/or solutions offered to the contract are compatible (the contracting authority allows for the technical documentation to be submitted in English).
2. Document confirming that the entity (s) that will perform the service:
— external mass storage,
— servers,
has a quality management system in compliance with ISO 9001 or equivalent to service provision.
3. Proof that the manufacturer of the equipment offered:
— external mass storage,
— servers,
it has an ISO 9001 certificate or equivalent.
4. Certificate or CE declaration of conformity of the equipment offered:
— external mass storage,
— servers,
— switches: FC, SFP, Eth.
5. A declaration by the contractor that the equipment offered is covered by the equipment manufacturer’s warranty for the period indicated in the contractor’s tender and that the warranty services of the producer are provided in Poland by the manufacturer’s authorised service. This declaration should include a list of authorised service providers in Poland.
The time limit for the submission of tenders shall be the same as the date for the submission of tenders.
IV. The contracting authority shall not provide for the complementary contracts referred to in Article 67 (1). 1 points 6 and 7 of the Public Procurement Act.
V. If the contractor is located outside Poland and in the country where the contractor is established or resides there does not appear to have any of the documents referred to in the notice, the provisions of the Regulation of the Minister for Development of 26 July 2016 on the types of documents which the contracting authority may require from the contractor in the procurement procedure (Journal of Laws 2016, item) shall apply. EUR 1126).
VII. Details of the conditions for participation are set out in the Terms of Reference.