We are happy to announce that the new version of the TED portal is going live on 29.01.2024 (indicative date - to be confirmed!) Interested in discovering the new functionalities, improvements and impact on the users? We invite you to visit our article and find out more about the main new changes and functionalities.

There are some bugs affecting the way eForms notices are displayed. We are working on solving the problem. In the meanwhile, please check our dedicated page for more information and guidance.

Registration is open for our 4th Workshop with TED reusers, on the 14th of December 2023

Works - 376264-2019

09/08/2019    S153

Germany-Munich: Structural shell work

2019/S 153-376264

Modification notice

Modification of a contract/concession during its term

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Deutsches Museum von Meisterwerken der Naturwissenschaft und Technik (AdöR)
Postal address: Museumsinsel 1
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 80538
Country: Germany
Contact person: Deutsches Museum Bau 1 — Bauprojekte Zukunftsinitiative
E-mail: bauabteilung@deutsches-museum.de
Telephone: +49 892179-661
Fax: +49 892179-665
Internet address(es):
Main address: http://www.deutsches-museum.de

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Sanierung Sammlungsbau: NV74 zu RA1.311.02 Rohbauarbeiten

Reference number: 16.316.00
II.1.2)Main CPV code
45223220 Structural shell work
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:

NV74_NA101 zu RA1.311.02 Rohbauarbeiten

II.2.2)Additional CPV code(s)
45262300 Concrete work
45262310 Reinforced-concrete work
45111100 Demolition work
45262330 Concrete repair work
45223500 Reinforced-concrete structures
45262522 Masonry work
45262210 Foundation work
45110000 Building demolition and wrecking work and earthmoving work
45262000 Special trade construction works other than roof works
II.2.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concession
Start: 23/03/2017
End: 15/11/2018

Section IV: Procedure

IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract
Notice number in the OJ S: 2017/S 067-125666

Section V: Award of contract/concession

Contract No: 16.316.00
Title:

RA1.311.02 Rohbauarbeiten

Section VII: Modifications to the contract/concession

VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45223220 Structural shell work
VII.1.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
VII.1.4)Description of the procurement:

Rohbauarbeiten

VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concession
Start: 25/03/2019
End: 18/04/2019
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 7 752.73 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Innovo Bau GmbH
Postal address: Wallbergstraße 12-18
Town: Dachau
NUTS code: DE217 Dachau
Postal code: 85221
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modification
Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive 2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:

Das vorliegende Nachtragsangebot beinhaltet eine Sonderlösung zur Herstellung einer Wandöffnung im Bestand, Achse SB3 im 1. OG Westtrakt. Im Übergangsbereich vom Westtrakt zum Nordtrakt ist in Achse SB3/SBI in der bestehenden Stahlbetonwand eine Türöffnung zu erstellen. Direkt dahinter befindet sich die F90 Trockenbauabtrennung zum Museumsbereich. Aufgrund der Begebenheiten im Bestand konnte die Baustellenabtrennung nicht anders ausgeführt werden. Ein im RA1 für die Wandöffnung notwendiger Arbeitsraum ist nun nicht gegegeben. Es wurde eine Lösung erarbeitet, die ein Umsetzen der Baustellenabtrennung und mögliche Beeinträchtigungen des Museumsbetriebes umgeht, indem das Ausführungsverfahren (Stahlblech als Schutzlage, Baubehelf als Einzelstütze, Betoniertrichter etc.) geändert und die Arbeiten in 3 Takten verrichtet wurden. Die daraus resultierenden Mehrkosten, sind geringfügig zu den Kosten, die entstehen würden, wenn die F90-Trennwände umgestzt werden müssten.

VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 16 626 995.42 EUR
Total contract value after the modifications
Value excluding VAT: 16 634 748.15 EUR