II.1.1)Title:
Umweltplanung ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 undSchnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1sowie Ersatzinvestition Oberbau (Strecke 6185)
Reference number: 18GEI34984
II.1.2)Main CPV code90712000 Environmental planning
II.1.3)Type of contractServices
II.2)Description
II.2.2)Additional CPV code(s)90712000 Environmental planning
II.2.3)Place of performanceNUTS code: DEE03 Magdeburg, Kreisfreie Stadt
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 03/01/2019
End: 30/03/2020
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
Umweltplanung ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 und Schnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1 sowie Ersatzinvestition Oberbau (Strecke 6185)
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code90712000 Environmental planning
VII.1.3)Place of performanceNUTS code: DEE0 Sachsen-Anhalt
VII.1.4)Description of the procurement:
Nt 5: PFA 3.5: Erarbeitung einer Screening-Unterlage, eines Artenschutz- Fachbeitrags sowie der Textbeiträge zum Erläuterungsbericht
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 14/07/2021
End: 31/12/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaireOfficial name: SchimmelmannConsult GmbH
Town: Nuthetal
NUTS code: DE4 Brandenburg
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Im Zuge des Vorhabens ABS Hannover-Berlin werden in der Baustufe 1 im PFA 3.5 in Vorbereitung auf die Arbeiten in den PFA 4.1 genehmigungsfreie Arbeiten nach § 18 AEG in der LST-Technik erforderlich. Für diese technischen Planungsteile zwischen Bahn-km 182,3 und km 183,315 (Strecke 6185) erfolgte die Erarbeitung einer Screening-Unterlage, eines Artenschutz- Fachbeitrags sowie der Textbeiträge zum Erläuterungsbericht zur Einreichung beim EBA im März 2021 sowie nach Abstimmung mit dem EBA bezüglich der Genehmigungsfreiheit des AFB im Juni 2021 zur Einreichung bei der UNB.
VII.2.3)Increase in price