Modification of a contract/concession during its term
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PFA 1.6a; Überwerfungsbauwerke, 18FEI33760
Reference number: 2021/S 129/343968
II.1.2)Main CPV code45220000 Engineering works and construction works
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PFA 1.6a; Überwerfungsbauwerke, 18FEI33760
Lot No: Los2A
II.2.3)Place of performanceNUTS code: DE11 Stuttgart
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 28/08/2018
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PFA 1.6a; Überwerfungsbauwerke, 18FEI33760
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code45220000 Engineering works and construction works
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Zuarbeit der Umwelt-Planung zur Einreichung der Genehmigungsplanung beim Eisenbahnbundesamt.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 24/06/2022
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)Total value of the contract/lot/concession: 1.00 EUR
VII.1.7)Name and address of the contractor/concessionaireOfficial name: Sweco GmbH
Postal address: Hanauer Landstr.135-137
Town: Frankfurt (Main)
NUTS code: DE712 Frankfurt am Main, Kreisfreie Stadt
Postal code: 60314
Country: Germany
The contractor/concessionaire is an SME: yes
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Änderungen und Anpassungen der Planungsgrundlagen.
VII.2.3)Increase in priceUpdated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 1.00 EUR
Total contract value after the modifications
Value excluding VAT: 1.00 EUR