Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PFA 1.6a; Los 2 B, Interregiokurve, Ingenieurbauwerke, 18FEI33267
Reference number: 2018/S 119-271605
II.1.2)Main CPV code45220000 Engineering works and construction works
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PFA 1.6a;Los 2 b, Interregiokurve, Ingenieurbauwerke
Lot No: 2B
II.2.3)Place of performanceNUTS code: DE11 Stuttgart
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 12/10/2017
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PFA 1.6a; Los 2 b Interregiokurve, Ingenieurbauwerke
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code44112000 Miscellaneous building structures
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Die Maßnahmen Anbindung Interregiokurve ist dem Planfeststellungsabschnitt 1.6 des Bauvorhabens S 21 Stuttgart-Ulm zuzuordnen und beinhaltet Maßnahmen der Zuführungsstrecken zum neuen Tiefbahn in Stuttgart.
Der Vertrag PFA 1.6 Los 2b Anbindung Interregiokurve umfasst die Planung und Errichtung der Verkehrsanlagen der Strecke 4721, die Errichtung der neuen Güterzugwendegleise sowie die Vorbereitung für die Anbindung der Zuführungsgleise zur Strecke 4726 und die Anbindung des Abstellbahnofes.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 22/08/2022
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive 2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Erforderliche geänderte und/oder zusätzliche Leistungen zur Erfüllung der Vertragsleistung oder zur Erreichung des werkvertraglichen Erfolges. die zusätzliche Leistung ist erforderlich, um die benötigten Kabeln beizustellen, da aufgrund der Minderung des Leistungsumfangs die Kabelmengen reduziert wurden.
VII.2.3)Increase in price