The Publications Office of the EU is in the process of updating some of the content on this website in the light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Works - 539015-2019

14/11/2019    S220    Works - Additional information - Not applicable 

France-Paris La Défense: Power distribution cables

2019/S 220-539015

Corrigendum

Notice for changes or additional information

Works

(Supplement to the Official Journal of the European Union, 2019/S 219-536656)

Legal Basis:

Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: RTE – Réseau Transport Electricité
Town: Immeuble WINDOW 7C, Place du Dôme 92073 Paris La Défense
NUTS code: FR
Country: France
Contact person: Noam Chebaye
E-mail: noam.chebaye@rte-france.com
Telephone: +33 179248070

Internet address(es):

Main address: http://www.rte-france.com

Address of the buyer profile: https://rte-france.bravosolution.com

I.1)Name and addresses
Official name: EirGrid plc
Town: Block 2 The Oval, 160 Shelbourne Road Dublin 4, Ireland
NUTS code: IE0
Country: Ireland
Contact person: Anthony Flood
E-mail: Anthony.Flood@Eirgrid.com
Telephone: +353 12370123

Internet address(es):

Main address: http://www.eirgrid.com

Address of the buyer profile: https://rte-france.bravosolution.com

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Engineering, Procurement and Construction package of works relating to the CELTIC interconnector project between France and Ireland

Reference number: 19013
II.1.2)Main CPV code
31320000
II.1.3)Type of contract
Works
II.1.4)Short description:

The electricial interconnection project consists of the construction of an HVDC 700 MW link.

The scope include the design, manufacturing, construction, commissioning and operation of HVDC cables systems and converter stations for the interconnection between France and Ireland. It also includes the connection to the HVAC network.

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
08/11/2019
VI.6)Original notice reference
Notice number in the OJ S: 2019/S 219-536656

Section VII: Changes

VII.1)Information to be changed or added
VII.1.2)Text to be corrected in the original notice
Section number: II.1.4)
Place of text to be modified: Short description:
Instead of:

The supplier will provide works with regard to the construction, installation and manufacturing of the 2 converterstations. 2 HVDC Voltage Sourced Converter VSC converter stations in France and in Ireland. Each stationconsists of 2 main buildings that house the power units (the AC to DC converters).

The scope includes the design, engineering, procurement, manufacture, supply, transportation, installation,construction, testing, commissioning, spares, warranty and maintenance of the converter stations.

Read:

Installation and manufacturing of both converter stations on either side of the border.

Section number: VI.3
Instead of:

Candidates interested in participating in this tender will be invited to attend the ‘Supplier Event’ which may be taken place from 20.1.2020 to 22.1.2020 in order to present the project and exchange information on the best way to execute it (technologies, materials, execution procedures, etc).

To attend this event, candidates must send their expression of interest (EOI) send their EOI via the e-procurement platform Bravosolution (https://rte-france.bravosolution.com) on RFI number 19013.

A questionnaire related to the project will to be sent to interested suppliers at a later stage (after the closing of this PIN) and the following the return of signed mutual non-disclosure agreement which is to be returned within 5 working days after the receipt.

Time-limit for receipt of ‘Expressions of Interest’ will be no later than 2.12.2019 at 17.00 (French Time).

Final submission date for questionnaire will be no later than 6.1.2020 at 17.00 (French Time).

This documentation will provide the basis for conversation and the exchange of information at the Supplier Event. Therefore, Candidates should take into account the above mentioned in order to present their alternatives and skills/technical abilities to perform works through the completion of the HVDC cable activities or converter functional requirements questionnaires.

This documentation will provide the basis for conversation and the exchange of information at the Supplier Event. Therefore, candidates should take into account the above mentioned in order to present their alternatives and skills/technical abilities to perform works through the completion of the HVDC cable activities or converter functional requirements questionnaires.

Note: this is a market research exercise and not the commencement of the formal procurement process. This process will formally commence at a later date following the publication of the contract notice in the OJEU.

This procurement shall be divided into lot and full detail of the lots shall be provided as part of the contract notice.

Read:

Candidates interested in participating in this tender will be invited to attend the ‘Supplier Event’ which may be taken place from 20.1.2020 to 22.1.2020 in order to present the project and exchange information on the best way to execute it (technologies, materials, execution procedures, etc).

To attend this event, candidates must send their expression of interest (EOI) via the e-procurement platform Bravosolution (https://rte-france.bravosolution.com) on RFI number 19013.

A questionnaire related to the project will to be sent to interested suppliers at a later stage (after the closing of this PIN) and the following the return of signed mutual non-disclosure agreement which is to be returned within 5 working days after the receipt.

Time-limit for receipt of ‘Expressions of Interest’ will be no later than 2.12.2019 at 17.00 (French Time).

Final submission date for questionnaire will be no later than 6.1.2020 at 17.00 (French Time).

This documentation will provide the basis for conversation and the exchange of information at the Supplier Event. Therefore, candidates should take into account the above mentioned in order to present their alternatives and skills/technical abilities to perform works through the completion of the HVDC cable activities or converter functional requirements questionnaires.

Note: this is a market research exercise and not the commencement of the formal procurement process. This process will formally commence at a later date following the publication of the contract notice in the OJEU.

This procurement shall be divided into lot and full detail of the lots shall be provided as part of the contract notice

VII.2)Other additional information: