Obras - 542688-2018

08/12/2018    S237    - - Works - Contract award notice - Negotiated procedure 

Norway-Bergen: Construction work

2018/S 237-542688

Contract award notice – utilities

Results of the procurement procedure

Works

Legal Basis:

Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Bybanen Utbygging
992 051 825
Postboks 7900
Bergen
5020
Norway
Contact person: Ole W. Mortensen
E-mail: bybanen@hfk.no
NUTS code: NO051

Internet address(es):

Main address: https://www.hordaland.no/bybanen-utbygging

I.2)Information about joint procurement
I.6)Main activity
Other activity: Transport

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

D14 Mindemyren

Reference number: D14
II.1.2)Main CPV code
45000000
II.1.3)Type of contract
Works
II.1.4)Short description:

A double light rail track is to be established from Kronstad to Kristianborg, approx. 1,5 km, with the accompanying road network, including infrastructure, a new open concrete water channel and 2 stops.

In addition, concrete constructions must be constructed; a bridge over a new stop at Kristianborg (E39 Fjøsangerveien), a tunnel portal to D15, foot/cycle culvert Minde Alle, with the accompanying main cycle path. The contract includes a lot of temporary infrastructure and traffic infrastructure.

Contract D14 consists of the following main work: (brief summary), piling, sheet piling, matter replacement, concrete work, water and sewage work, ground work for track and road and temporary alterations.

See Annex A Work Description for further information.

II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.1)Title:
II.2.2)Additional CPV code(s)
44212400
45220000
45223000
45233161
45233162
45234129
45247000
45262300
II.2.3)Place of performance
NUTS code: NO051
II.2.4)Description of the procurement:

A double light rail track is to be established from Kronstad to Kristianborg, approx. 1,5 km, with the accompanying road network, including infrastructure, a new open concrete water channel and 2 stops.

In addition, concrete constructions must be constructed; a bridge over a new stop at Kristianborg (E39 Fjøsangerveien), a tunnel portal to D15, foot/cycle culvert Minde Alle, with the accompanying main cycle path. The contract includes a lot of temporary infrastructure and traffic infrastructure.

Contract D14 consists of the following main work: (brief summary), piling, sheet piling, matter replacement, concrete work, water and sewage work, ground work for track and road and temporary alterations.

See Annex A Work Description for further information.

II.2.11)Information about options
Options: yes
Description of options:

See the tender documentation.

II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Negotiated procedure with prior call for competition
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.6)Information about electronic auction
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: yes
IV.2)Administrative information
IV.2.1)Previous publication concerning this procedure
Notice number in the OJ S: 2018/S 176-400233
IV.2.8)Information about termination of dynamic purchasing system
IV.2.9)Information about termination of call for competition in the form of a periodic indicative notice

Section V: Award of contract

A contract/lot is awarded: no
V.1)Information on non-award
The contract/lot is not awarded
Other reasons (discontinuation of procedure)

Section VI: Complementary information

VI.3)Additional information:

Reason for the cancellation:

Bybanen Utbygging has given an account of the uncertainty around access to Bane NOR´s area at Mindemyren in Annex A Work Description. It has become apparent that this uncertainty will probably have greater consequences for the contract than what is stated in the published Contract Document and Annex B, point 4 and Annex C, point 3. Furthermore, confirmation has been given that the work documents will be delayed, so that they will not be ready by the announced construction start for the contract. Bybanen Utbygging must, therefore, assess the construction start for the contract, as these conditions could mean that tenderers who did not apply for prequalification would have done so if these new premises were known. This is not possible to correct this in any other way than a cancellation, so we see that we have an obligation to cancel the competition.

Visma notice: https://opic.com/id/afoeqapgau

VI.4)Procedures for review
VI.4.1)Review body
Hordaland fylkeskommune v/Bybanen Utbygging
Bergen
Norway
VI.4.2)Body responsible for mediation procedures
VI.4.3)Review procedure
VI.4.4)Service from which information about the review procedure may be obtained
VI.5)Date of dispatch of this notice:
06/12/2018