Modification of a contract/concession during its term
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PFA 1.6a; Los 2 B, Interregiokurve, Ingenieurbauwerke, AVL-5
Reference number: 2018/S 119-271605
II.1.2)Main CPV code44112000 Miscellaneous building structures
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PFA 1.6a;Los 2 b, Interregiokurve, Ingenieurbauwerke
Lot No: 2B
II.2.3)Place of performanceNUTS code: DE11 Stuttgart
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 12/10/2017
End: 25/05/2020
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PFA 1.6a; Los 2 b Interregiokurve, Ingenieurbauwerke
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code44112000 Miscellaneous building structures
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Im Baufeld werden wegen den Höhenunterschieden beim Gelände Verbaue zum Abfangen des Erdreichs benötigt. Aufgrund der Absturzgefahr beim Verbau sind nach den Unfallverhütungsvorschriften Absturzsicherungen notwendig, die bisher nicht beauftragt worden sind.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 01/02/2019
End: 31/12/2019
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for modification brought about by circumstances which a diligent contracting authority/entity could not foresee (Art. 43(1)(c) of Directive 2014/23/EU, Art. 72(1)(c) of Directive 2014/24/EU, Art. 89(1)(c) of Directive 2014/25/EU)
Description of the circumstances which rendered the modification necessary and explanation of the unforeseen nature of these circumstances:
Bei den Leistungen handelt es sich um zusätzliche Leistungen, welche nötig sind, um den Verbau an die geltenden Unfallverhütungsvorschriften anzupassen. Eine Vergabe an einen weiteren/anderen AN ist nicht zweckmäßig, da ein unmittelbarer Zusammenhang mit der vom AN-Bau zu erbringenden Leistung besteht. Eine wirtschaftliche Ausführung der o. g. Leistungen kommt demnach nur durch den AN-Bau in Betracht.
VII.2.3)Increase in price