Lavori - 100195-2014

Mostra versione ridotta

26/03/2014    S60    Banca europea per la ricostruzione e lo sviluppo - Lavori - Avviso di gara - Procedura ristretta 

Bosnia-Erzegovina-Sarajevo: BERS - Costruzione della centrale idroelettrica da 20 MW a Vranduk, n. EPBiH-HPP Vranduk- S&I/1-3/14-BERS

2014/S 060-100195

Invitation for prequalification

Project name: Construction of Vranduk Hydro Power Project

Country: Bosnia and Herzegovina

Business sector: Power and Energy

Project ID: 7310-PRE-44199

Funding source: EBRD loan proceeds

Type of contract: Project goods, works and services

Type of notice: Invitation for Prequalification

Issue date: 20 March 2014

Closing date: 17th April 2014 (12:00 hrs local time)

This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices (http://www.ebrd.com/pages/workingwithus/procurement/project.shtml) on 24th January 2013 and updated 14th March 2014.

JP Elektroprivreda BiH d.d. Sarajevo, hereinafter referred to as "the Client", intends using part of the proceeds of a loan from the European Bank for Reconstruction and Development, hereinafter referred to as "the Bank", towards the cost of Una Kostela and Vranduk Hydro Power Project.

The Client intends prequalifying firms and consortia to tender for the following contract, hereinafter referred to as "the Contract", to be funded from part of the proceeds of the loan:

Construction of HPP Vranduk 20 MW

Subject of the Procurement is construction of HPP Vranduk on river Bosna and it includes the design, manufacturing, supply and installation of equipment, testing and commissioning.

HPP Vranduk is located in the municipality of Zenica, at the location between the city of Zenica and Nemila settlement near the settlement of Vranduk. The area to be covered by the project extends along the left bank of the Bosna river from the Jelina train station up to the dam profile located about 150 m downstream from the Bosna V bridge on the main road, and then the left bank downstream from the Bosna IV bridge up to the Nemila settlement. HPP Vranduk is a new diversion run-of-the-river hydropower plant that will operate continuously with a maximum upper water level of 293.50 m above sea level (m a.s.l.) and small water storage reservoir. It has been designed with an operating capacity of 19.63 MW of installed power, produced by three Kaplan turbine generator units (one small at the dam for ecological flow and two units in the main powerhouse). The electricity generated will be transferred to the transmission and local distribution network for the benefit of domestic end-users.

HPP Vranduk consists of the following main components:

- A new dam with a small generating unit, a fish ladder and a gate storage chamber;

- An intake structure upstream on the left river bank;

- A power tunnel on the left side of the river upstream from the dam site between the intake structure and the powerhouse;

- A powerhouse, control building, assembly plateau and switchgear building downstream at the end of the power tunnel;

- Water storage reservoir, 6 km long;

- New access roads and reconstruction of existing roads

- A tailrace between the powerhouse and the downstream riverbed;

- Deepening of the downstream riverbed between the Bosna IV bridge and the village of Nemila (approximately 2.5 km);

- Temporary cofferdams for the construction of the dam (in two phases) and of the powerhouse, as well as for allowing the connection of the intake structure to the power tunnel.

Prequalification and tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms and joint ventures of firms from any country.

Prequalification documents may be obtained from the office at the address below upon payment of a non-refundable fee of 300 BAM or equivalent in a convertible currency.

Payment instructions are as follows:

Applicants from outside of Bosnia and Herzegovina

Vakufska banka d.d. Sarajevo,

account 1601060000004629,

IBAN CODE: BA 391601020000013652,

BIC/SWIFT:VAKUBA22

in favour of JP Elektroprivreda BiH d.d. Sarajevo

With purpose of obtaining of Prequalification Document No. EPBiH-HPP Vranduk- S&I/1-3/14-EBRD

Payment instruction shall state that ''all cost bear applicant" (our)

Applicants from within Bosnia and Herzegovina

Sparkasse bank d.d. Sarajevo

account 1990490176075902

in favour of JP EP BiH d.d. Sarajevo

With purpose of obtaining of Prequalification Document No. EPBiH-HPP Vranduk- S&I/1-3/14-EBRD

Upon receipt of appropriate evidence of payment of the non-refundable fee, hard copy of documents will promptly be dispatched by courier; however, no liability can be accepted for their loss or late delivery. Interested companies will be informed by e-mail about dispatching of documents. At the same time PDF version of document will be submitted.

The prequalification documents must be duly completed and delivered to the address below, on or before 17th April 2014 at 12.00 p.m. local time. Documents which are received late may be rejected and returned unopened.

Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office:

Mr. Edib Bašić, JP Elektroprivreda BiH d.d. Sarajevo, Project Implementation Unit, Vilsonovo šetalište 15, 71000Sarajevo, Bosnia and Herzegovina. Tel +387 33 751 030. Fax + 387 33 751 033. E-mail e.basic@elektroprivreda.ba