Works - 305181-2020

30/06/2020    S124

United Kingdom-Truro: Carriageway resurfacing works

2020/S 124-305181

Contract notice

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Cornwall Council
Postal address: County Hall, Treyew Road
Town: Truro
NUTS code: UKK3 Cornwall and Isles of Scilly
Postal code: TR1 3AY
Country: United Kingdom
Contact person: Mr Mike Shillaber
E-mail: Mike.Shillaber@cornwall.gov.uk
Telephone: +44 1872322716

Internet address(es):

Main address: http://www.cornwall.gov.uk

Address of the buyer profile: http://www.cornwall.gov.uk

I.1)Name and addresses
Official name: Plymouth City Council
Postal address: Ballard House, West Hoe Road
Town: Plymouth
NUTS code: UKK4 Devon
Postal code: PL1 3BY
Country: United Kingdom
E-mail: Paul.Williams@Plymouth.gov.uk

Internet address(es):

Main address: www.plymouth.gov.uk

I.2)Information about joint procurement
The contract involves joint procurement
I.3)Communication
The procurement documents are available for unrestricted and full direct access, free of charge, at: https://procontract.due-north.com/Advert/Index?advertId=ba8e5de6-71a8-e911-80f8-005056b64545
Additional information can be obtained from the abovementioned address
Tenders or requests to participate must be submitted electronically via: https://procontract.due-north.com/Advert/Index?advertId=ba8e5de6-71a8-e911-80f8-005056b64545
I.4)Type of the contracting authority
Regional or local authority
I.5)Main activity
General public services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Resurfacing of the Main Deck of the Tamar Bridge, Including the North and South Cantilever Lanes.

Reference number: DN422865
II.1.2)Main CPV code
45233223 Carriageway resurfacing works
II.1.3)Type of contract
Works
II.1.4)Short description:

Resurfacing of the Main Deck of the Tamar Bridge, including the north and south cantilever lanes. The successfully appointed contractor will also be required to safely remove the existing installed series of illuminated lane studs and ensure resurfacing work is completed to the agreed programme, to allow for prompt installation of the replacement studs by the separately appointed supplier, as a key part of the overall resurfacing project. There is also the potential scope to include ancillary expansion joint replacement and resurfacing of the Toll Plaza Area.

The value of the works is estimated to within the range of GBP 4.5 million to GBP 5.3 million.

The work is anticipated to take place over a period of up to 6 months, anticipated to commence from April 2021.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.1)Title:
II.2.2)Additional CPV code(s)
45233251 Resurfacing works
II.2.3)Place of performance
NUTS code: UKK3 Cornwall and Isles of Scilly
NUTS code: UKK4 Devon
Main site or place of performance:

Along the Tamar Bridge, which spans the border of Devon and Cornwall.

II.2.4)Description of the procurement:

The resurfacing overall is concerned with implementing Stage 2 of the current resurfacing strategy and follows on from the resurfacing Stage 1 of the Plymouth side span in 2011. The stage 1 works just replaced the worst section that had failed prematurely, due to onerous loading conditions.

Stage 2 of the resurfacing strategy, which includes the main deck centre span and the Saltash side span and north and south cantilever lanes, was based on a policy of lifetime maximisation of the existing surfacing system until such a point when noticeable and problematic degradation commenced.

At the time it was anticipated that the remaining areas would achieve their anticipated design life span in excess of 12 years and at the then anticipated levels of degradation was expected to last for another 3-7 years (2014-2018). It is now the point where the maximum life has been extracted from the remaining surfacing and replacement is required, commencing in Spring 2021.

Key constraints:

• The bridge must remain open to vehicular traffic with a minimum of one lane in each direction throughout the entire duration of these proposed works and two lanes in one direction and one lane in the other at specified peak times.

• The maximum thickness of the proposed surfacing system shall not exceed 55 mm (nominal) and the minimum thickness shall not be less than 40 mm (nominal) as part of the requirements for deflection control and wheel-load distribution into the structure. Although 55 mm depth has already been used successfully on the Plymouth side there is a considerably more significant structural loading implication if it is proposed to be used over the full length of main span and the Saltash side. Preferred solutions will therefore minimise the depth as far as possible to the lower end of the permissible 40 mm – 55 mm range. Preferred solutions will also consider variance of the proposed thicknesses between the main deck and the cantilever lanes. The cantilever lanes experience lower traffic levels and preferred solutions will be at the lowest end of the thickness range. The North and South cantilevers shall have the same proposed surfacing thickness.

• Localised tapering of the edges of the surfacing along kerb lines and at expansion joints will be necessary for proposed systems exceeding 40 mm nominal thickness. (This was successfully achieved on the 2011 Plymouth side resurfacing and is possible).

Anticipated provisional solutions:

The following systems are expected to be the most likely to be suitable as the choice for the final proposed system.

• approved sprayed methyl methacrylate waterproofing system (2 layer) plus;

• (up to) a maximum of 55 mm ‘Gussasphalt’ type surfacing (as applied on Plymouth sidespans), or similar equivalent;

• or 40 mm Polymer modified mastic asphalt;

• or 40 mm Mastic asphalt (notionally as per the current 38 mm system but with an additional 2 mm depth to compensate for the removal of the original nominal 2 mm bituminous waterproofing);

• other surfacing system materials may be considered provided they can be shown to be equivalent to the above and compatible with the other requirements of this document;

• the Toll Plaza surfacing system will be different and the outline specification will be a subject for discussion in dialogue.

The outline specifications for discussion in dialogue will all be based on a design life of 20 years for the surfacing system. Tamar Crossings project team intend for this to result in a service life of 20 years subject to the assumptions of the design life (e.g. traffic effects) not being exceeded. The appointed surfacing contractor will be responsible for ensuring that all material supply and installation is compliant with final specifications.

It is envisaged that the client will seek to develop and enhance the agreed specification and scope of works, in collaboration with a likely maximum of 3 contractors, to be selected to discuss practical possibilities and options, through a formal competitive dialogue procurement process, to arrive at an optimum working solution for the most suitable surfacing application of the somewhat limited known options. over an agreed period of time.

Please note: a detailed contractor briefing document has been prepared and access to that, to further electronic information concerning this project, and to the pre- qualifying questionnaire documentation can only be gained via the Supplyingthesouthwest.org.uk portal, wherein this project has the reference DN422865.

All formal communications or queries regarding this opportunity, must only be accessed or made via the supplyingthesouthwest.org.uk portal under Project Reference DN422865.

II.2.5)Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 6
This contract is subject to renewal: no
II.2.9)Information about the limits on the number of candidates to be invited
Envisaged number of candidates: 3
Objective criteria for choosing the limited number of candidates:

It is intended to use the following objective criteria for selecting the limited number of candidates to take through to the competitive dialogue stage of the overall process, based around clarity of their capability, availability and agreement on contractual preliminaries.

More specifically an expectation that prospective Contractors can meet or demonstrate the following mandatory requirements:

1) A successfully completed pre-qualification questionnaire including an expression of interest confirming willingness to participate in the proposed competitive dialogue process for its full duration.

2) Confirmation of suitability of previous experience to undertake such works and a clear understanding of health and safety and traffic management requirements.

3) Confirmation of availability of adequate resources to undertake the works commencing with design and planning in early 2021.

4) Contractor's initial views on proposed form of contract, intended to be NEC3., tender period, liabilities and insurances to assist with achievement of a short but productive series of dialogue meetings, prior to tender submissions, tender assessment and governance approval periods prior to contract award.

In addition to the aforementioned requirements and compliance with the general requirements of the PQQ, the selection of the appropriate candidates, to take through to the competitive dialogue stage of the process, will be primarily based on their responses to the 4 scored quality assessment questions, included within the PQQ, with the 3 highest scoring contractors overall being taken through to the dialogue stage.

II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: no
II.2.14)Additional information

Section III: Legal, economic, financial and technical information

III.1)Conditions for participation
III.1.1)Suitability to pursue the professional activity, including requirements relating to enrolment on professional or trade registers
III.1.2)Economic and financial standing
III.1.3)Technical and professional ability
III.1.5)Information about reserved contracts
III.2)Conditions related to the contract
III.2.2)Contract performance conditions:
III.2.3)Information about staff responsible for the performance of the contract

Section IV: Procedure

IV.1)Description
IV.1.1)Type of procedure
Competitive dialogue
IV.1.3)Information about a framework agreement or a dynamic purchasing system
IV.1.4)Information about reduction of the number of solutions or tenders during negotiation or dialogue
IV.1.6)Information about electronic auction
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no
IV.2)Administrative information
IV.2.1)Previous publication concerning this procedure
Notice number in the OJ S: 2019/S 141-346344
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 30/07/2020
Local time: 15:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
English
IV.2.6)Minimum time frame during which the tenderer must maintain the tender
Duration in months: 4 (from the date stated for receipt of tender)
IV.2.7)Conditions for opening of tenders

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.2)Information about electronic workflows
VI.3)Additional information:
VI.4)Procedures for review
VI.4.1)Review body
Official name: Cornwall Council Monitoring Officer
Postal address: New County Hall
Town: Truro
Postal code: TR1 3AY
Country: United Kingdom
VI.4.2)Body responsible for mediation procedures
VI.4.3)Review procedure
VI.4.4)Service from which information about the review procedure may be obtained
VI.5)Date of dispatch of this notice:
25/06/2020