Works - 376271-2019

09/08/2019    S153

Germany-Munich: Structural shell work

2019/S 153-376271

Modification notice

Modification of a contract/concession during its term

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority/entity

I.1)Name and addresses
Official name: Deutsches Museum von Meisterwerken der Naturwissenschaft und Technik (AdöR)
Postal address: Museumsinsel 1
Town: München
NUTS code: DE212 München, Kreisfreie Stadt
Postal code: 80538
Country: Germany
Contact person: Deutsches Museum Bau 1 — Bauprojekte Zukunftsinitiative
E-mail: bauabteilung@deutsches-museum.de
Telephone: +49 892179-661
Fax: +49 892179-665
Internet address(es):
Main address: http://www.deutsches-museum.de

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Sanierung Sammlungsbau: NV76 zu RA1.311.02 Rohbauarbeiten

Reference number: 16.316.00
II.1.2)Main CPV code
45223220 Structural shell work
II.1.3)Type of contract
Works
II.2)Description
II.2.1)Title:

NV76_NA102 zu RA1.311.02 Rohbauarbeiten

II.2.2)Additional CPV code(s)
45262300 Concrete work
45262310 Reinforced-concrete work
45111100 Demolition work
45262330 Concrete repair work
45223500 Reinforced-concrete structures
45262522 Masonry work
45262210 Foundation work
45110000 Building demolition and wrecking work and earthmoving work
45262000 Special trade construction works other than roof works
II.2.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concession
Start: 23/03/2017
End: 15/11/2018

Section IV: Procedure

IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract
Notice number in the OJ S: 2017/S 067-125666

Section V: Award of contract/concession

Contract No: 16.316.00
Title:

RA1.311.02 Rohbauarbeiten

Section VII: Modifications to the contract/concession

VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code
45223220 Structural shell work
VII.1.3)Place of performance
NUTS code: DE212 München, Kreisfreie Stadt
VII.1.4)Description of the procurement:

Rohbauarbeiten

VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concession
Start: 01/04/2019
End: 31/05/2019
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
Total value of the contract/lot/concession: 37 558.10 EUR
VII.1.7)Name and address of the contractor/concessionaire
Official name: Innovo Bau GmbH
Postal address: Wallbergstraße 12-18
Town: Dachau
NUTS code: DE217 Dachau
Postal code: 85221
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modification
Need for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:

Das vorliegende Nachtragsangebot beinhaltet zum einen einen zusätzlichen Abfangträger im 1. UG Kern 4, Bereich Sozialräume und zum anderen zusätzliche Bleche in den ELT-Trassen der Galerien (EG ZG und 1.OG ZG) in der Luft-und Raumfahrthalle. Nach bereits abgeschlossenen Stahlbauarbeiten, inkl. W+M Planung in den oberen Geschoßen, ist auch im Untergeschoß im 1. UG Kern 4, Bereich Sozialräume ein Abfangträger notwendig. Durch eine Änderungsmeldung wurde die Ausführung der ELT-Trassen in den Galerien LuR geändert. Die Überdeckung mit Hohlraumboden entfällt, stattdessen wird der Bereich nun mit Estrich überdeckt. Die Überdeckung des Schlitzes im Rohboden soll mit einer 10 mm starken Stahlplatte (ca. 200 lfm) inkl. Aussparungen 400x400 mm (ca. 115 Stück) unterhalb der Revisionsöffnungen, erfolgen. Nachdem Innovo bereits die Rohbaumaßnahmen ausgeführt hat, soll auch der Einbau der Z-Winkel und der Stahlplatten inkl. Aussparungen über die gesamten Längen von Innovo erfolgen.

VII.2.3)Increase in price
Updated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 16 663 297.83 EUR
Total contract value after the modifications
Value excluding VAT: 16 700 855.93 EUR