Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PFA 1.3a, VE 10-Light Los 1 Rohbau, 18FEI32068
Reference number: 2019/S 230-565065
II.1.2)Main CPV code45223220 Structural shell work
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PFA 1.3a, VE 10-Light Los 1 Rohbau
II.2.3)Place of performanceNUTS code: DE11 Stuttgart
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 15/10/2019
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PFA 1.3a, VE 10-Light Los 1 Rohbau,
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code45223220 Structural shell work
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Planungs- und Bauleistung
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 12/07/2022
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)Total value of the contract/lot/concession: 1.00 EUR
VII.1.7)Name and address of the contractor/concessionaireOfficial name: ARGE Flughafentunnel c/o Ed.Züblin AG, Direktion IU-Tunnelbau
Postal address: Albstadtweg 5
Town: Stuttgart
NUTS code: DE11 Stuttgart
Postal code: 70567
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Erforderliche geänderte und/oder zusätzliche Leistungen zur Erfüllung der Vertragsleistung oder zur Erreichung des werkvertraglichen Erfolges
VII.2.3)Increase in priceUpdated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 1.00 EUR
Total contract value after the modifications
Value excluding VAT: 1.00 EUR