Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Bopfingen, Goldshöfe, Trochtelfingen; Bahnsteigerhöhung; Planungen
Reference number: 18FEI34520
II.1.2)Main CPV code71322500 Engineering-design services for traffic installations
II.1.3)Type of contractServices
II.2)Description
II.2.2)Additional CPV code(s)71322500 Engineering-design services for traffic installations
II.2.3)Place of performanceNUTS code: DE111 Stuttgart, Stadtkreis
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionDuration in months: 36
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code71322500 Engineering-design services for traffic installations
VII.1.3)Place of performanceNUTS code: DE111 Stuttgart, Stadtkreis
VII.1.4)Description of the procurement:
Vermessung, Objektplanung (OPl) Verkehrsanlagen, OPl Ingenieurbauwerke, Tragwerksplanung, geol. Erkundung und Beratung, Technische Ausstattung, etc.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionDuration in months: 36
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaireOfficial name: DB Engineering&Consulting GmbH
Town: Stuttgart
NUTS code: DE111 Stuttgart, Stadtkreis
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Die DB E&C ist für die Planung gesamthaft beauftragt und befindet sich inmitten der Earbeitung der Entwurfsplanung und Genehmigungsplanung. Eine neue Beauftragung eines AN hätte den Projektablauf um mehrere Wochen nach hinten verschoben (Einreichung der GP an das EBA) so, dass das Projekt damit gefährdet gewesen wäre.
VII.2.3)Increase in price