Contract award notice – utilities
Results of the procurement procedure
Legal Basis:
Directive 2014/25/EU
Section I: Contracting entity
I.6)Main activityRailway services
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
BIM-Planungsleistungen Verkehrsstation Erneuerung Themar und Bahnsteigverlängerung Gotha
Reference number: 20FEI46370
II.1.2)Main CPV code71322500 Engineering-design services for traffic installations
II.1.3)Type of contractServices
II.1.6)Information about lotsThis contract is divided into lots: yes
II.2)Description
II.2.1)Title:
Los 1 — Verkehrsstation Themar
Lot No: 1
II.2.2)Additional CPV code(s)71322500 Engineering-design services for traffic installations
II.2.3)Place of performanceNUTS code: DEG0E Hildburghausen
II.2)Description
II.2.1)Title:
Los 2 — Verkehrsstation Gotha
Lot No: 2
II.2.2)Additional CPV code(s)71322500 Engineering-design services for traffic installations
II.2.3)Place of performanceNUTS code: DEG0C Gotha
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Previous publication concerning this procedure Section V: Award of contract
Title:
Los 1 — Verkehrsstation Themar
A contract/lot is awarded: yes
V.2)Award of contract
V.2.1)Date of conclusion of the contract:28/10/2020
V.2.3)Name and address of the contractor
Official name: DB Engineering & Consulting GmbH
Town: Erfurt
NUTS code: DEG01 Erfurt, Kreisfreie Stadt
Country: Germany
The contractor is an SME: no
V.2.4)Information on value of the contract/lot (excluding VAT)
V.2.5)Information about subcontracting
Section V: Award of contract
Title:
Los 2 — Verkehrsstation Gotha
A contract/lot is awarded: yes
V.2)Award of contract
V.2.1)Date of conclusion of the contract:28/10/2020
V.2.3)Name and address of the contractor
Official name: Emch&Berger GmbH
Town: Halle
NUTS code: DEE02 Halle (Saale), Kreisfreie Stadt
Country: Germany
The contractor is an SME: no
V.2.4)Information on value of the contract/lot (excluding VAT)
V.2.5)Information about subcontracting
Section VI: Complementary information
VI.5)Date of dispatch of this notice:28/10/2020