Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PA 1.4, Brücken VE 316 Los 2, 20FEI45780
Reference number: 2020/S 236-581654
II.1.2)Main CPV code45221110 Bridge construction work
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PA 1.4, Brücken VE 316 Los 2, 20FEI45780
II.2.3)Place of performanceNUTS code: DE111 Stuttgart, Stadtkreis
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 01/02/2021
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PA 1.4, Brücken VE 316 Los 2, 20FEI45780
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code45221110 Bridge construction work
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Die Abdichtung im Bereich der Widerlagerwand ist zu schützen, da es nicht mit Sickersteinen in diesem Bereich
funktioniert ist dieser Bereich mit Magerbeton zu schützen.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 27/09/2021
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)Total value of the contract/lot/concession: 1.00 EUR
VII.1.7)Name and address of the contractor/concessionaireOfficial name: Leonhard Weiss GmbH & Co.KG
Postal address: Leonhard-Weiss-Str. 22
Town: Göppingen
NUTS code: DE114 Göppingen
Postal code: 73037
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Grundsätzliche geänderte Anforderungen an die Entwurfs- und /oder Ausführungsplanung
VII.2.3)Increase in priceUpdated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 1.00 EUR
Total contract value after the modifications
Value excluding VAT: 1.00 EUR