Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Umweltplanung ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 undSchnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1sowie Ersatzinvestition Oberbau (Strecke 6185)
Reference number: 18GEI34984
II.1.2)Main CPV code90712000 Environmental planning
II.1.3)Type of contractServices
II.2)Description
II.2.2)Additional CPV code(s)90712000 Environmental planning
II.2.3)Place of performanceNUTS code: DEE0 Sachsen-Anhalt
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 03/01/2019
End: 31/12/2022
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
Umweltplanung ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 undSchnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1sowie Ersatzinvestition Oberbau (Strecke 6185)
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code90712000 Environmental planning
VII.1.3)Place of performanceNUTS code: DEE0 Sachsen-Anhalt
VII.1.4)Description of the procurement:
Umweltplanungsleistungen
ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 und
Schnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1
sowie Ersatzinvestition Oberbau (Strecke 6185)
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 07/10/2021
End: 30/03/2022
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaireOfficial name: Schimmelmann Consult GmbH
Town: Nuthetal
NUTS code: DE4 Brandenburg
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Die umweltfachliche Zuarbeit zum Erläuterungsbericht der PFA 4.1, 4.4., 5.1, 5.2 ist an den Gesamtplaner erforderlich, da nicht beim Gesamtplaner beauftragt
VII.2.3)Increase in price