Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
Umweltplanung ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 undSchnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1sowie Ersatzinvestition Oberbau (Strecke 6185)
Reference number: 18GEI34984
II.1.2)Main CPV code90712000 Environmental planning
II.1.3)Type of contractServices
II.2)Description
II.2.2)Additional CPV code(s)90712000 Environmental planning
II.2.3)Place of performanceNUTS code: DEE03 Magdeburg, Kreisfreie Stadt
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 03/01/2019
End: 31/12/2022
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
Umweltplanung ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 undSchnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1sowie Ersatzinvestition Oberbau (Strecke 6185)
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code90712000 Environmental planning
VII.1.3)Place of performanceNUTS code: DEE03 Magdeburg, Kreisfreie Stadt
VII.1.4)Description of the procurement:
Umweltplanungsleistungen
ABS Hannover- Berlin, Lehrter Stammbahn (Strecke 6107) Baustufe 1 und
Schnellfahrstrecke Hannover – Berlin (Strecke 6185) Baustufe 1
sowie Ersatzinvestition Oberbau (Strecke 6185)
Die Leistungen sind in Hauptvertrag und optionale Leistungen unterteilt, Kartierleistungen sind Hauptvertragsleistungen.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 10/10/2022
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.1.7)Name and address of the contractor/concessionaireOfficial name: Schimmelmann Consult GmbH
Town: Nuthetal
NUTS code: DE4 Brandenburg
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Die Umweltplanung ist nachträglich in die Anteile des baurechtlichen Verfahrens §18 AEG und §22b AEG aufzuteilen.
Eine Fremdvergabe wäre aufgrund der Komplexität nur mit sehr hohem Aufwand durch den Dritten und damit unwirtschaftlich möglich.
Ein zu beauftragender dritter Planer müsste zur Leistungserbringung sämtliche Grundlagen und Schnittstellen neu nachvollziehen, was zu zeitlichen Verzögerungen und zusätzlichen Kosten führen würde.
VII.2.3)Increase in price