Modification of a contract/concession during its term
Legal Basis:
Directive 2014/25/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PFA 1.3a, VE NBS Ost Los 2 Rohbau, 18FEI32068, AVL-L2-001
Reference number: 2019/S 158-363200
II.1.2)Main CPV code45223220 Structural shell work
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PFA 1.3a, VE NBS Ost Los 2 Rohbau
Lot No: Los 2
II.2.3)Place of performanceNUTS code: DE11 Stuttgart
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 15/10/2019
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PFA 1.3a, VE NBS Ost Los 2 Rohbau, 18FEI32068, AVL-L2-001
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code45223220 Structural shell work
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Die Anzahl der Baubüros des AG müssen aus Kapazitätsgründen von 4 auf 8 aufgestockt werden, zusätzlich ist das Baubüro aufgrund der erhöhten Personenzahl mit WC-Anlage sowie Küche+Aufenthaltsraum für den AG auszustatten.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 04/12/2019
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)Total value of the contract/lot/concession: 1.00 EUR
VII.1.7)Name and address of the contractor/concessionaireOfficial name: ARGE Flughafentunnel c/o Ed.Züblin AG, Direktion IU-Tunnelbau
Postal address: Albstadtweg 5
Town: Stuttgart
NUTS code: DE11 Stuttgart
Postal code: 70567
Country: Germany
The contractor/concessionaire is an SME: no
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Ein Wechsel des AN ist aus technischen Gründen nicht möglich, da die zusätzlichen Baubüros direkt an die Beauftragten Büros angeschlossen werden müssen und das Baubüro des AG auf den Baustelleneinrichtungsflächen des AN aufgestellt wird ebenso die WC-Anlage und Küche etc.
VII.2.3)Increase in priceUpdated total contract value before the modifications (taking into account possible earlier contract modifications and price adaptions and, in the case of Directive 2014/23/EU, average inflation in the Member State concerned)
Value excluding VAT: 92 780 992.56 EUR
Total contract value after the modifications
Value excluding VAT: 92 780 993.56 EUR