I.1)Name, addresses and contact point(s)

Angus Council
Angus House, Orchardbank Business Park
For the attention of: Chief Executive
DD8 1AX Forfar
United Kingdom
Telephone: +44 8452777778

Internet address(es):

General address of the contracting authority: http://www.angus.gov.uk/

Address of the buyer profile: http://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00236

Further information can be obtained from: Angus Council
County Buildings, Market Street
Contact point(s): Roads
For the attention of: Richard Meeson
DD8 3WR Forfar
United Kingdom
Telephone: +44 1307473185
E-mail: meesonr@angus.gov.uk
Fax: +44 1307473388
Internet address: http://www.angus.gov.uk/

I.2)Type of the contracting authority
Regional or local authority
I.3)Main activity
General public services
Environment
I.4)Contract award on behalf of other contracting authorities
The contracting authority is purchasing on behalf of other contracting authorities: no

Section II.A: Object of the contract (Works)

II.1)Title attributed to the contract by the contracting authority:
Brechin Flood Prevention Scheme.
II.2)Type of contract and location of works
Main site or location of works: Brechin, Angus, Scotland, UK.
UKM21
II.3)Information on framework agreement
II.4)Short description of nature and scope of works
Civil Engineering work to construct the Brechin Flood Prevention Scheme which consists of Direct River Defences and a surface water drainage system.
The direct river defences include a mixture of grassed earthen embankments and reinforced concrete walls along the north bank of the River South Esk. Earthen embankments are up to 1,8 m high, totalling 700 m in length. The reinforced concrete walls will be up to 1,8 m high totalling 800 m in length. A concrete seepage barrier will be installed beneath the embankments and walls, approximately 2,5 m below existing ground levels.
The secondary drainage system includes replacing an existing urban culverted watercourse with a pressurised Ductile Iron DN900 culvert (with a single inlet and outlet), approximate length 350, and upgrading existing roads drainage within the carriageway with a DN450 Road Carrier drain, approximate length 700 m. A number of new road gulleys and kerb drains will be required.
Installation of No .3 submerged pump stations (maximum depth ~5 m below existing ground levels) and associated drainage to outfalls and control kiosks. A number of headwall structures will be constructed on the banks of the River South Esk.
Due to the nature of the proposed works, general roadworks and environmental enhancements are proposed throughout the site and have been incorporated into the Scheme design. This includes raising a section of existing footway on the banks of the River South Esk by 0,6 m above existing ground levels.
A number of demolition works are required, to allow construction of the walls and embankments. These works will include demolition of a number of small industrial / out-buildings within East Mill industrial estate. Additionally a riverside revetment is to be demolished along River Street to allow construction of a reinforced concrete retaining (flood) wall.
A number of utility diversionary works are required to allow installation of the proposed scheme works. Utility diversion works are to be incorporated into the main contract works. Angus Council will assist in organising and programming the works.
The works are to take place within the southern part of Brechin, adjacent to the River South Esk which is a Special Area of Conservation. Consequently consideration on construction methods and mitigation measures will be necessary. Angus Council will obtain a Complex CAR licence from SEPA and will require the contractor to submit the necessary documentation in due course. Works take place within an area prone to flooding and necessary flood protection measures will need to be in place during the construction phase of the works to ensure the site is protected during flood events. Additionally there will be work required to existing drains and culverted watercourses which have the potential to impact the water environment and surrounding land use. Consequently the contractor will be required to mitigate the impact from these activities.
Estimated value excluding VAT: 11 000 000 GBP
II.5)Common procurement vocabulary (CPV)

45200000, 45351000, 45111240, 45232450, 45232451, 45232452, 44163110, 43324000, 45233140, 45246000, 45246400, 45246410, 44212382, 42131143

II.6)Scheduled date for start of award procedures and duration of the contract
Scheduled date for start of award procedures: 4.11.2014
Scheduled date for
start of works: 15.12.2014
completion of works: 31.3.2016
II.7)Information about Government Procurement Agreement (GPA)
The contract is covered by the Government Procurement Agreement (GPA): yes
II.8)Additional information:

Section III: Legal, economic, financial and technical information

III.1)Conditions relating to the contract
III.1.1)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
Interim payments.
III.2)Conditions for participation
III.2.1)Information about reserved contracts

Section VI: Complementary information

VI.1)Information about European Union funds
VI.2)Additional information:
(SC Ref:292123)
VI.3)Information on general regulatory framework
Relevant governmental Internet sites where information can be obtained

Environmental protection legislation http://www.sepa.org.uk/water/water_regulation.aspx

VI.4)Date of dispatch of this notice:
27.2.2014