Modification of a contract/concession during its term
Legal Basis:
Directive 2014/24/EU
Section I: Contracting authority/entity
Section II: Object
II.1)Scope of the procurement
II.1.1)Title:
S21, PFA 1.6a; Los 2 B, Interregiokurve, Ingenieurbauwerke, AVL-12
Reference number: 2018/S 119-271605
II.1.2)Main CPV code44112000 Miscellaneous building structures
II.1.3)Type of contractWorks
II.2)Description
II.2.1)Title:
S21, PFA 1.6a; Los 2 b, Interregiokurve, Ingenieurbauwerke
Lot No: 2B
II.2.3)Place of performanceNUTS code: DE11 Stuttgart
II.2.7)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 12/10/2017
End: 25/05/2020
Section IV: Procedure
IV.2)Administrative information
IV.2.1)Contract award notice concerning this contract Section V: Award of contract/concession
Title:
S21, PFA 1.6a; Los 2 b Interregiokurve, Ingenieurbauwerke
Section VII: Modifications to the contract/concession
VII.1)Description of the procurement after the modifications
VII.1.1)Main CPV code44112000 Miscellaneous building structures
VII.1.3)Place of performanceNUTS code: DE11 Stuttgart
VII.1.4)Description of the procurement:
Die ca. 22 000 t Baumaterial für das Überwerfungsbauwerk werden aufgrund geänderter Bauumstände nicht mehr per LKW, sondern mit dem Schienenverkehr auf die Baustelle angeliefert.
VII.1.5)Duration of the contract, framework agreement, dynamic purchasing system or concessionStart: 01/02/2019
End: 31/12/2019
VII.1.6)Information on value of the contract/lot/concession (excluding VAT)
VII.2)Information about modifications
VII.2.2)Reasons for modificationNeed for additional works, services or supplies by the original contractor/concessionaire (Art. 43(1)(b) of Directive 2014/23/EU, Art. 72(1)(b) of Directive 2014/24/EU, Art. 89(1)(b) of Directive 2014/25/EU)
Description of the economic or technical reasons and the inconvenience or duplication of cost preventing a change of contractor:
Bei den o.g. Leistungen handelt es sich um zusätzliche Leistungen, welche nötig sind, um den termingerechte Antransport des Baumaterials für das Überwerfungsbauwerk sicher zu stellen. Eine Vergabe an einen weiteren/anderen AN ist nicht zweckmäßig, da ein unmittelbarer Zusammenhang mit der vom AN-Bau zu erbringenden Leistung besteht. Eine wirtschaftliche Ausführung der o.g. Leistungen kommt demnach nur durch den AN-Bau in Betracht. Die Leistungserbringung durch einen weiteren/anderen AN ist unwirtschaftlich und wäre folglich mit nicht zu vermeidenden Zusatzkosten und erhebliche Beeinträchtigungen des Baubetriebes im gegenständlichen Bereich verbunden.
VII.2.3)Increase in price